Now on the App Store·iPhone + Apple Watch

Stronger every week.
Zero guesswork.

Iridium reads your overnight recovery — HRV, sleep, per‑muscle fatigue — and engineers the exact session you’re ready for. Then it adapts, set by set, as you train.

Live workout in Iridium: dumbbell bench press with video and set logging
Iridium’s Today screen with a 94 readiness score and all seven recovery signals
Strength Score screen with Elite rating in Iridium
HRVSleepResting HRRespiratory RateWrist TempMuscle RecoveryTraining LoadRead every morning
How it works

One tap. The thinking’s done.

Most apps log what you did. Iridium decides what’s next — and tells you why.

01
While you sleep

It reads your body.

Every morning, Iridium pulls seven recovery signals from your wearable — HRV, sleep, resting heart rate, and more — and models fresh fatigue for every muscle you’ve trained.

02
One tap at the gym

It builds the session.

Today’s workout is engineered from your readiness, your schedule, your gym’s actual equipment, preferences you’ve told the coach, the time you have, and even the weather — with the reasoning behind every exercise written out.

03
As you train

It adapts with you.

Log a set and the AI re-tunes what’s left — loads, reps, rest. Outperform the plan and the plan catches up. Finish knowing you did exactly what your body could handle.

Iridium’s coach recommendation and workout generator

Precision you can feel.

Every screen answers one question: what should I do right now?

Every muscle, mapped.
Recovery

Every muscle, mapped.

Recovery percentages for every muscle — down to individual heads. Lats, rear delts, each triceps head. Know what’s ready before you load the bar.

Engineered, not templated.
Smart Generation

Engineered, not templated.

Each session is built fresh from your readiness, goals, equipment, and time — with the reasoning in plain language. Edit anything before you start.

A coach in your corner.
Live Training

A coach in your corner.

HD exercise video, live heart rate, rest timers on your Lock Screen — and live AI set analysis that re-tunes the rest of your session the moment you outperform the plan.

Ask anything. It knows your training.
AI Coach

Ask anything. It knows your training.

Your coach sees your workouts, recovery, and nutrition. Ask it to find patterns, reshape today’s session, or set a goal — it acts, not just answers.

Progress

Numbers that mean something.

Not streaks and confetti — the metrics serious lifters actually watch, tracked automatically.

Strength Score

One number for whole-body strength, adjusted for bodyweight. Climb the ranks from Getting Started to Elite.

Strength Score screen showing 392 with an Elite badge and progress chart

Volume Landmarks

Weekly sets measured against MEV, MAV, and MRV for every muscle group. Stay in the growth zone — get nudged before you leave it.

Training volume screen with MEV, MAV and MRV landmarks per muscle group

Muscle Balance

Chest vs. back, quads vs. hamstrings, front vs. rear delts — Iridium tracks opposing strength ratios and flags imbalances before they become injuries.

Muscle balance screen comparing opposing muscle groups with an imbalance detected

Personal Records

Max weight, estimated 1RM, volume, reps, pace — every improvement caught automatically, the moment it happens.

Personal records screen grouped by date with automatic PR detection

Progress Charts

Estimated 1RM and volume trends for every exercise you touch. Months of work, visible at a glance.

Progress charts showing 1RM and volume trends for multiple exercises

Body Measurements

Weight, body fat, muscle mass, and every circumference — charted over time. Snap a DEXA or InBody report and AI imports the numbers.

Body measurement charts for muscle mass, waist, weight and body fat
Total control

Hands-off when you want.
Hands-on when you care.

Iridium plans for you — but never locks you out. And the details serious lifters expect are already built in.

Advanced set types

Supersets, circuits, drop sets, myo-reps, timed and failure work — programmed or built by hand.

Edit everything

Swap, reorder, or override any exercise or set — before you start or mid-workout. The AI adjusts around you.

Templates, your way

Build your own, snap a photo of a written program and let AI import it, or save any generated session.

Every gym you train at

Equipment profiles with max weights and plate math — film your gym and AI recognizes the machines.

Plate math, solved

Tell it the target weight and it tells you exactly what to load, per side — for every bar type, on phone and watch.

Weather-aware training

Heat, rain, smoke, or darkness — Iridium moves your session indoors, adapts the plan, and raises your water target on hot days.

Plugs into your AI

Connect Claude, ChatGPT, or any MCP-compatible AI to your training data — ask for insights, or let it log your meals and macros for you.

RPE & smart rest

RPE targets on a 1–10 scale, rest timers tuned to the work, and Live Activity countdowns on your Lock Screen.

36 achievements, 6 tiers

Bronze through Legendary — the 1,000,000-lb club, PR streaks, volume milestones. Earned, never given.

Widgets everywhere

Home Screen, Lock Screen, Dynamic Island, Control Center — macros, muscle volume, and timers at a glance.

Voice, both ways

Spoken countdowns, PR call-outs, and coaching cues mid-set — and your voice to log food or talk to the coach.

Private by default

Your training lives on your device and your iCloud. Tracking is minimal — richer analytics only if you opt in.

Your data stays yours

Export everything to CSV and keep full local or iCloud backups — your training history is never held hostage.

Fuel

Fuel, logged in seconds.

Training and nutrition in one app — your targets know what you did in the gym today. Log by photo, voice, barcode, search, or plain description.

Point. Shoot. Logged.

Aim your camera at the plate — the AI meal scanner identifies every item and researches the macros before you pick up your fork.

AI meal scanner identifying grilled chicken salad items with calorie labels

Macros that keep up

Calories, protein, carbs, and fat against daily targets — with protein pacing that keeps you honest all day, and voice logging from your Apple Watch.

Iridium nutrition dashboard with calories, macros and water tracking

Hydration, engineered

Water targets that rise on hot days and after long sessions. One-tap logging, pacing through the day, and a celebration when you hit the goal.

Hydration tracking screen with daily total and logged water entries
Apple Watch

Train from your wrist.

Complete sets, track rest periods, and calculate plate loads — without touching your phone.

Smart Rest Timer

Smart Rest Timer

Live heart rate + next exercise preview

Quick Set Entry

Quick Set Entry

Adjust weight, reps & RPE with Crown

Plate Calculator

Plate Calculator

Weight → Plates or Plates → Weight

Multiple Bar Types

Multiple Bar Types

Olympic, Hex, EZ-Curl, and more

Syncs with iPhone app
Adjustable rest timers
Next exercise preview

Built for the lifters who show up — three, four, five days a week — and want every session to count.

Ready when you are.

Free to download on iPhone and Apple Watch. Your first intelligent workout is a minute away.

Android coming soon.